5.1 General Requirements

Each Owner must submit, or designate its Owner Representative to submit, a completed bid application (and only one such bid application)[13] for each Generation Unit for which it intends to participate in the SREC Procurement Pilot Program. The application (the form of which is appended hereto as Appendix A) must include:

  • a description of the Generation Unit, including its location, the types of solar panels being used and its nameplate rating (at STC);[14]
  • a description of all supplemental funding from public sources (other than grants in lieu of investment tax credits) which the project has received, applied for or is or will be entitled to receive;
  • if the Owner is not qualified to submit an application on its own behalf or if the Owner otherwise elects to designate an Owner Representative, the identity of the Owner Representative; and
  • designation of the GATS account (of the Owner or Owner Representative) into which the SRECs will be deposited.

In addition, each bid application must be accompanied by:

  • a standard form agreement (an “SREC Transfer Agreement”) to sell SRECs to the SEU executed by the Owner and, if necessary or elected, an Owner Representative;
  • the appropriate deposit; and
  • an analysis of the estimated annual energy output using PVWatts Solar PV Energy Calculator or such other modeling technique as may be acceptable to the SEU.

5.2 Estimated Output

Each application to sell SRECs pursuant to the SREC Procurement Pilot Program must include a binding estimate of: (a) the annual energy output of the Eligible Energy Resource, as determined using PVWatts Solar PV Energy Calculator or such other modeling technique as may be acceptable to the SEU; and (b) the annual SREC production levels (such estimate of the SREC production levels, the “Estimated SREC Quantity”). The estimates for energy output and SREC production levels shall be subject to an annual degradation factor of 0.5%.

For Eligible Energy Resources claiming a bonus based on the use of Delaware-sourced equipment and/or an in-state workforce (as described in Section 2.3 above), the application must include a description of the equipment and/or identification of the contractor or workforce upon which such claim is based and the binding SREC output estimate for such resources should include any such SREC bonus.[15] Failure to claim a bonus at the time an application is submitted will disqualify a project from being entitled to the bonus, regardless of whether Delaware-sourced equipment or an in-state workforce is later employed.

5.3 Bid Deposit

Each application to participate in the SREC Procurement Pilot Program must be accompanied by a bid deposit in an amount equal to $100 per kW (DC) of the nameplate rating (at STC) of the Eligible Energy Resource; provided that the bid deposit will be waived for qualifying projects that provide a copy of their DPSC certification as an Eligible Energy Resource along with their bid application. All bid deposits must be in the form of an acceptable letter of credit, cash or a bid bond[16] and will be held by the SEU on behalf of the participating retail electricity suppliers.

The bid deposits will be returned or released promptly upon: (a) rejection of an application; or (b) termination of an SREC Transfer Agreement based on the imposition by the interconnecting utility of a charge other than a standard interconnection fee (as described in Section 6.4 below). In addition, if an Owner claims in its application that a project will be entitled to the Delaware Equipment Bonus or the Delaware Workforce Bonus and such project is not certified by the DPSC as being eligible for either such “claimed” bonus, the bid deposit will be forfeited and the SREC Transfer Agreement will be terminated. Otherwise, the bid deposit will be returned upon completion and commencement of operation of the Generation Unit on or prior to the Guaranteed On-Line Date (as defined in Section 6.5 below) and the posting of performance credit support (as described in Section 6.9 below). For Generation Units that commence operation after such date, the bid deposit will be used to pay delay liquidated damages (as described in Section 6.5 below) and the balance, if any, will be returned to the Owner promptly after the commencement of operation and the posting of performance credit support (as described in Section 6.9 below). Cash deposits will not earn interest.

[13] A Generation Unit may not be included in more than one bid application in any single solicitation. If such unit is not awarded an SREC Transfer Agreement as a result of such solicitation, the Owner is free to submit an application for such unit pursuant to any future solicitation.

[14] The equipment description contained in the application is not binding on an Owner or an Owner Representative, provided that: (a) except as expressly permitted in accordance herewith, the nameplate rating (at STC) of any substitute equipment may not vary from that described in the original application by more than 5% for Tier 1 or Tier 2 projects, or 2.5% for Tier 3 projects; and (b) in no event will the substitution of different equipment affect the Estimated SREC Quantity contained in the original application.

[15] The “bonus” SRECs are not actually credited to retail electricity suppliers until they retire the SRECs to which the bonus applies. However, under the terms of the SREC Transfer Agreements, as long as the Owner provides evidence that the DPSC has certified that the Eligible Energy Resource qualifies for the bonus, payment for the SRECs will include the bonus amount.

[16] A bid bond must be in the form of American Institute of Architects (AIA) Form 310. In addition, any applicant that provides a bid bond as bid security will be required to replace such bond with a deposit in the form of a letter of credit or cash no later than 10 days after the SEU provides notice that its bid application has been granted.